Project
|
Year
|
Client
|
Main Contractor and Description
|
Fertilizers
|
Fertilizer Projects
|
1979
|
Jordan Fertilizer Industry Co.
|
Spie Batignolles
|
Hangers
|
Air Craft Hanger
|
2007
|
Joramco
|
Hesham Wadi Est.
|
Jordan Multi Tipurpose Maintenance & Sustainment Facilities |
2015 |
Parsons |
Steel Structure |
NDT services for Hangers |
2015 |
Al Balqa Universtity |
NDT Services
|
Power Stations
|
Hussein Power station Zarka
|
1981
|
Jordan Electric Authority.
|
Breda – Ansoldo Boiler
|
Aqaba thermal Power Station
|
1986
|
Jordan Electric Authority.
|
1-Mitsubishi Co. Boilers Inspection.
2- Samsung Co. Tanks Inspection
3-Franco Tosi Co. Turbine Inspection.
|
Al Rehab Power Station
|
2008-2009
|
Altaher Electro-mechanical Est.
|
Tank Inspection According to API 650 PETRA as Third Party
|
|
2010-2012
|
Rehab Power Station (third Party) – All Tests
|
Al Taher Co.
|
|
1994 |
|
al- najah engineering company |
|
2009 |
• Rehab Power Station (third Party) – All Tests |
Al Taher Co. |
Cement Factories
|
Manaseer Co. cement factory project
|
2010/2011/2012
|
Qatraneh Cement Plant Factory
|
Manaseer Co. for mining and cement
|
|
|
Qatraneh Cement Plant Factory |
Ashour Industrial Co. (Tanks) (Third Party ) All Tests |
|
|
Qatraneh Cement Plant Factory |
STX . Heavy Industries Co.
Factory& kiln |
Fohais Cement Factory
|
1983
|
Jordan Cement Co.
|
Kobe Steel co.
Kilns: Tanks, Pipes
|
South Cement Factory
|
|
Jordan Cement Co.
|
Kobe Steel Co.
Kilns: Tanks pressure
|
Heat Exchanger |
2014 |
Universal Modern Industries Co. For Edible Oil |
Inspection for heat exchanger |
Sukhtian Tank for Cosmetics and Chemical Products |
2014 |
Sukhtian |
|
Potash Projects
|
Potash Factories
|
1986
|
Arab Potash Co. Stage 2
|
1-YIT Finland Co. Tanks, Pipes & Rotary
|
|
1993-1994
|
|
2-Wimby Co.
Pipes, Joint
Crystallize & Tanks
|
|
1993-2000
|
|
3-ATL Eng. Co.
Boiler & Pipes
|
|
2001/2002
|
|
4-The Tenth Construction Company Of Sinopec Kemapco Project
|
|
2001/2002
|
|
5-Jordan Bromine Project
|
|
2008
|
Issuing WPQR
Pipe Inspection
|
6- Industrial Construction Co. Issuing WPQR
Pipe Inspection
|
|
2009
|
|
7- China Co.
|
NDT for pipes
|
2007
|
Solar ponds project
|
China International Water and Electric corp.(CWE)
|
NDT for Tank, Pipe, Ducts
|
2001
|
Kempco Project Arab Potash Company
|
the Tenth Company of Sinopec
|
Eshidiyeh Project
|
2012/2013/2014
|
JIFCO
MID
ONSHORE
|
JIFCO / Jordan Indian Fertilizing Company /Onshore company project 701119- sulfuric acid plant and phosphoric acid plant in ESHIDIYEH and EM-42 phosphoric acid tank farm in Aqaba site.
|
Petroleum Refinery
|
1987
|
Jordan Petroleum Co.
|
Kukje- – ICC
Tanks
|
|
1989
|
|
Siraga Industries
Tanks, Pipes
|
|
1999
|
|
United Metal Works
Tanks
|
|
1999-2000
|
|
Hyundai
Tanks, Pipes
|
|
Jan-00
|
Jordan Petroleum Co.
|
2-Duro Felguera Amman & Irbid & Zarqa
Gas Filling Stations
|
Pipeline Projects
|
L.P.G Pipes
Liquid petroleum and gas
|
1981-1983
|
State Company for oil projects SCOP IRAQ
|
1-State Org. for oil Projects – Iraq
Kerkuk – Samarra
|
L.P.G Pipes
|
1993
|
Jordan petroleum company
|
MES-A-R Taha with.Al-Mutahideh for construction and petroleum services company
|
Chlorine Factory(Contract for Erection work to 20 tpd caustic soda plant)
|
1994
|
National Chlorine Industries Company
|
Project Technologists PVT.LTD
|
Expansion project
|
2002
|
national chorine industries company
|
inspection and testing of the pipes
|
Disi Water Project
|
2010/2011/2012/2013/2014
|
Industrial Construction Co.
SMAW/R.S.S
|
Industrial Construction Co. Disi Project, Issuing pWPS for:
SMAW/R.S.S
Issuing of WPQR
|
Water Projects
|
1987
|
Jordan Water Authority
|
1-EMI - Pipes
|
|
1987
|
|
2-Astraco Cont. Co.
Pipes
|
|
|
|
3-Enex Contr. Co.
Pipes
|
|
|
|
4-Bittar & Salih Co.
Pipes
|
|
1993
|
Jordan Water Authority
|
5-Husein Abu – Ta’a
Pipes
|
|
1994
|
|
6-Enex Contr. Co.
Pipes
|
|
1994
|
|
7-Hussin Atieh Es.
Pipes
|
|
1999-2000
|
|
8-Civil Eng. Cont. Co. Pipes Improvement of the Amman Al- Samra Wastewater Project
|
|
1988
|
Jordan Valley Authority
|
1-Hanbo Co.
Pipes
|
|
1995
|
King Talal – Dam
|
2-Technical
Pipes
|
|
1995
|
|
3-Issa & Naffa’
Dejaneh Water
Pipes
|
|
1997
|
|
4-Salni – Italy
Karmeh Dam
Pipes
|
|
2002-2004
|
|
5-The Arab Contractors Deir Alla- Zai- Amman Pipeline.
|
Sahab Water Project
|
1995
|
|
Founder Asptau Contracting
|
Al- Ramtha Water Project
|
1995
|
|
Hussain Abu -Talal Company
|
Halabat Pipeline 8000 m
|
1992
|
|
Water Authority of Jordan and Al-Ta'awon Company
|
Tunnel Pipe Line
|
1992
|
|
Water Authority of Jordan and Al-Ta'awon company
|
Zebdeh Project/Tafilleh
|
1996
|
|
Founder Mechanical Constructor
|
Al- Resha Gas Tank Station
|
1994
|
|
al- najah engineering company
|
Al- Rehab Gas Station
|
1994
|
|
al- najah engineering company
|
Expansion and Improvement Al- Salt Water
|
1994
|
|
zeyad salah company
|
Water Pipe Project
|
2000
|
AKKIM Chemicals Industrials
|
EL CONCORDE Construction Co
|
|
2008-2009
|
Abdali District Heating & Cooling Scheme
|
Massader Contracting Co.
|
|
|
Issuing pWPS and WPQR for:SMAW
ESAB R.S.S TIGAW
|
|
Hamuda Cooling Project
|
2011-2012
|
Hammuda cooling system , piping and cooling system
|
Manufacture: ALPHA Refrigeration & Air conditioning Est
Client: Hammuda
|
Radiographic tests of the steam and refrigeration system |
1989 |
Electro Mechanical International - Franz-Kirchfeld GMBH |
|
Wadi Al-Husban Contract No. 24/90 |
1991 |
El-Issa & Naffa' Engeneering & Contracting Co. |
Magnetic particle
Liquid penetrate
Radiographic test
Holiday detector
|
Contract No. 508/97 testing & inspection requirement of carbon steel |
1999 |
Jordan Petroleum Co.
( UMCO )
|
Magnetic particle
Liquid penetrate
Radiographic test
Holiday detector
|
As Samra Wastewater Treatment Plant |
2007 |
Morganti |
Radiographic Inspection
Liquid Penetrant Test
Magnetic Particle Test
|
Mujib & Southern Ghors Irregation – Stage II |
2003 |
Dar AL Handasah |
Radiographic procedure and acceptance criteria |
Irbid water distribution system |
1987 |
National Water & Sewerage Projects Co. |
Welding inspection and tests |
South Amman Water System Contract No. 46/68 |
1991 |
Electro Mechanical International - Military Housing Establishment
( Water Authority)
|
Magnetic particle
Radiographic test
|
South Amman System Contract No. 47/86 |
1987 |
Shurafa Contracting Company |
Liquid penetrate
Radiographic test
|
Bid No. 14/88 Khat Al Swaqa |
1988 |
Water Authority |
Radiographic test
Holiday detector
|
Deir Alla-Zai-Amman Satge II Contract No. 128/2000 |
2002 |
Water Authority |
Magnetic particle
Radiographic test
|
Irbid Water & Sewer Construction |
1988 |
Water Authority |
Radiographic test
Holiday detector
|
Official approval to carry the authority Projects |
1988 |
Water Authority |
Magnetic particle
Liquid penetrate
Radiographic test
Holiday detector
|
Supplying Northern Areas of Karak Governorate with Water from Mujib Dam |
2015 |
Water Authority/
Gama Engineering Company |
Radiographic test
Holiday detector
Welding Test |
Wadi Al Seer Traffic light / Tunnel Project |
2015 |
Greater Amman Municipality/ M.A. Abu Eisheh & Brothers Contracting Co. |
Magnetic particle
Radiographic test
Holiday detector |
Medical Projects
|
Medicine Factory
|
1994
|
1-Al nejman Bulk Pharmatical – Pipes
|
1-Al nejma Bulk Pharmaceuticals – Pipes
|
Medicine Factory
|
1999
|
2-Pharma International Co.
|
2-Pharma International Co.
|
Medicine Factory
|
2000
|
3-River Of Jordan Est. Pipes
|
3-River Of Jordan Est. Pipes
|
Medicine Factory
|
2008
|
4-Hikma Pharmaceuticals Co
|
4-Hikma Pharmaceuticals Co
|
Medicine Factory
|
2008
|
5-Al-Rahma Pharmaceutical Co.
|
5-Al-Rahma Pharmaceutical Co.
|
Medicine Factory
|
2008
|
6-Jordanian Pharmaceutical Manufacturing Co.
|
6-Jordanian Pharmaceutical Manufacturing Co.
|
De-Ionized Water Loop
|
2006
|
Dar-AL-Dawa
|
Dar-AL-Dawa
|
Medicine Factory
|
2009
|
7-The Arab Pharmaceutical Manufacturing Co. Ltd
|
7-The Arab Pharmaceutical Manufacturing Co. Ltd
|
Genome Medical Factory
|
2014
|
Genome/Medical Company
|
Genome/Medical Company
|
Veterinary and Agricultural Manufacturing Products Company |
2014 |
Vapco |
EMA Mixer |
Tanks Projects
|
Spherical Vessels and Tanks
|
2007
|
Duro-Felguera
|
Duro - Felguera and Jordan Refinery 3 sites Amman , Jordan refinery in Zarqa and Rehab PowerStation in Irbid
|
Eshidiyeh Project |
2012/2013/2014 |
JIFCO
MID
ONSHORE |
JIFCO / Jordan Indian Fertilizing Company /Onshore company project 701119- sulfuric acid plant and phosphoric acid plant in ESHIDIYEH Onshoor Contracting PT & RT for all steel Structure and buildings |
Spherical Tanks
|
1978-1988
|
Jordan refinery
|
ASTRACO
|
Spherical Tanks
|
1990
|
Republic of Iraq Technical Corps for Special Projects (Technical)
|
Bechtel Re-Central refinery includes: -All types and site of spherical and chemical tanks - All types and site of spherical and pipes
|
Storage and Chemical tanks
|
1996
|
Indo- Jordan chemicals company
|
Eshidiyeah project 1st stage
|
Fuel Oil and Naphtha Additional Storage Tanks
|
1999
|
Jordan Refinery
|
Hyundai
|
Storage Tanks
|
2008
|
Mashaar Al MunaAL Kheiam Al Mutawara
|
Fathi Al Muhtasseb & Bros. Co.
|
Storage Tanks
|
2008-2012
|
Najjar Industrial Trading Co.
|
Tank Inspection RT /MT & PT
Coating Thickness
Issuing of pWPS and WPQR for FCAW
Welder Test According to FCAW
|
|
2009-2010
|
• Qatraneh Cement Co.
(Third Party ) – All Tests
|
|
Chemicals Tank
|
2010/2011-2012
|
Onshore Co.
|
Jiffco / MID About 30 tanks and all pipes connected between tank ( different size and thickness)
|
Chemical Tanks
|
|
Techcoep - Republic of Iraq
|
Maleic Anhydride plant Taji LPG plant
|
Tanks and Kiln
|
|
Qatraneh Cement Plant Factory
|
2-Heavy Cement Research & Design Institute (CNBM)
|
Chemical Tanks
|
1994
|
Solvochem Holland B. V
|
22 Steel Chemical Tanks In Aqaba
|
Air port station
|
2011
|
Jordan- refinery petroleum
|
Christopher D
|
Tanks paints testing
|
2013
|
Piping Cooling system for tanks
Paints testing Welder test & PQ
|
Constinidis S. A. – Atermon S. A. – KZU Group Engineering L.t.d
|
Kitchen Gas Tank for deliver KSA |
2014-2015 |
Al Salam boilers Company |
Gas Tanks |
Chlorine Tanks |
2014 |
National Chlorine Industries Co. Ltd. |
Chlorine Tanks |
Tender No. 16/2006 Queen Alia International Airport |
2012 |
Kzu Group Ebgeneering LTD |
Fuel Storage Tank |
Aqaba Project |
2012/2013/2014 |
JIFCO
MID
ONSHORE |
JIFCO / Jordan Indian Fertilizing Company /Onshore company project 701119- sulfuric acid plant and phosphoric acid plant in Aqaba Contracting PT & RT for all steel Structure and buildings |
Al-Mwaqar
Industrial City |
2015 |
Sahara Contracting
Corporation |
NDT services ( RT/ VT/MT/PT
and Vacuum Box ) for water
erected tank in Al-Mwaqar
Industrial City |
JIFCO NDT services 07150018 GN
JIFCP PLANT ESHIDIA-JORDAN
|
2015 & 2016 |
JIFCO |
NDT maintainance services |
Bridges Projects
|
Bridges Projects
|
2008-2010
|
* Bridge Inspection
RT & PT
pWPS @ WPQR
Welder Test
|
Najjar Industrial Trading Co.
|
Steel Structure
|
Steel Structure Projects and Cement Kiln
|
2009-2010
|
Qatraneh Cement Plant Factory
|
1-STX Heavy Industries Co.
|
|
|
|
2-AN DONG STEEL Structure & Machinery Co.
|
Qatraneh Cement Project
|
2010-2011
|
Qatraneh Cement Plant Factory
|
3-Al - Manaseer Co. for mining and cement
|
Abdali Distract Heating & Cooling project
|
2008-2012
|
Abdali District Heating & Cooling Scheme
|
Massader Contracting Co. Issuing pWPS for:
SMAW, ESAB, R.S.S, TIGAW
Issuing of WPQR
|
Zara Main project
|
2004-2010
|
Morganti Group.
|
Morganti Group. (Zara Maein pipeline) SMAW
ESAB R.S.S TIGAW
|
Asamra Waste Water Treatment Plant
|
2014
|
Waste Management Piping
|
Morganti Group Co. Expansion Bot project
|
Gas Plant
|
Petroleum Refinery
|
1987
|
Jordan Petroleum Co.
|
Kukje- – ICC
Tanks
|
L.P.G Pipes
|
1993
|
Jordan petroleum company
|
MES-A-R Taha with.Al-Mutahideh for construction and petroleum services company
|
Gaz station (Al Resha )
|
2013-2014
|
gas pipe line VT & RT Inspection
|
National Petroleum Co. NPC
|
Dam Projects
|
Karameh Dam
|
2004
|
El-Issa & Naffa' Engineering and Contracting Co
|
Steel Structure and Pipelines
|
Karama Dam
|
1996
|
Jordan Valley Authority
|
Salini Costruttori
|
Kafreen Dam
|
1997
|
Jordan Valley Authority
|
Salini Costruttori
|
Al Mujib Dam
|
2005
|
Kolin Construction Co.
|
Steel Structure and Pipelines
|
Kufranja Water Dam
|
2013-2014
|
Condotte Co.
|
Training welders for brazing welding Design clump for brazing welding Design vacuum box for testing
|
Wadi Arab Dam & Irregation Project |
1987 |
Hanbo General Construction |
X-Ray Test
|
Supplying Northern Areas of Karak Governorate with Water from Mujib Dam |
2015 |
Water Authority/
Gama Engineering Company Radiographic test |
Radiographic test
Holiday detector
Welding Test |
Other Plants
|
Taji LPG Plant
|
1990
|
Ministry of Industry Iraq
|
NDT for: Central Refinery Project and Petrochemical Complex #2JV
|
MALEIC Anhydride Plants Taji LPG Plant
|
1991
|
Republic of Iraq Technical Corps for Special Projects (Technical)
|
Republic of Iraq technical corps for special projects (technical)
|
Detergent Factory |
|
|